Install Weekend

Friday I replaced all the interior bits that I bought. I have a few more interior pieces on the way than that is basically done.

Thanks to help from one of the local RX-7 people, the motor mounts are changed out. We also replaced the crush washers for the oil injectors, belts, and fusable links. Today I replaced the starter and negative battery cable.

I still need to replace the shifter boot, and rebuild the oil metering pump. My list is starting to get really small.

Before:
After:

Leave a Reply

Your email address will not be published. Required fields are marked *