The motor is basically ready to start. One of theĀ A/C hard lines needs a pin hole to be repaired to get it charged. I replaced all the o-rings in the system. The entire engine bay is together. I need to get a battery still. The brake system is also ready to do the final bleeding. The cooland will need all the air out of the system but we need to start it first. I need to do the bushings in the front end still.
Under Hood Install Part 2
Leave a reply