Subframe Cleaned and ready for the motor and transmission

The subframe is ready to go back in the car once I get the motor and transmission installed. I was able to get the subframe cleaned really good. I installed the iPD sway bar, FWD steering rack, and Delrin bushings.

I cleaned the motor and started on the maintenance work, new timing belt kit, cam seals, and PCV.

Some of the parts pulled off the silver car:

Leave a Reply

Your email address will not be published. Required fields are marked *